F-Cycle Programming Examples


The moterised test stands have automatic cycle function. Just set a program, the test can be done automatically.

There are 2 types of cycle.

D-Cycle: The test is operated based on displacement
F-Cycle: The test is operated based on force.

F-Cycle
NOTE:
◊   To run a F-cycle, nomal connect and communication must be built between a force gauge to the test stand.
◊   The force (F1,F2,F3) you set on test stand is value of force only, it can be any unit of force (N, kgf or lbf or ). So, the unit you want has to be set in the force gauge.
    On the other hand, even same force, if you changed its unit in force gauge, you must change the value corresponding with the new unit in test stand.
◊   If the force value you set cannot achieve, The test stand will still run until triggering some limit alarm, then Interrupt.

Setting Interface


O: Absolute coordinates of Start Point;
F1,F2,F3: Force achieved in Section 1,2,3

V1,V2,V3: Speed of Section 1,2,3
or :Moving direction.
N: Cycle Time

T0: Dwell time at Start Point
T1, T2, T3: Dwell time at End Point of Section 1, 2, 3






All Rights Reserved © 2013 Shenzhen Polygon Instrument Limited